مناقصات اعادة تعمير العراق لهيئات مختلفة |
Iraq Re-Construction Tenders for deferent Authorities |
General Information
|
Document Type: |
Presolicitation Notice |
|
Solicitation Number: |
W912GB-04-R-0028 |
|
Posted Date: |
Jan 30, 2004 |
|
Original Response Date: |
Feb 09, 2004 |
|
Current Response Date: |
Feb 09, 2004 |
|
Original Archive Date: |
Apr 09, 2004 |
|
Current Archive Date: |
Apr 09, 2004 |
|
Classification Code: |
Y -- Construction of structures and facilities |
|
Set Aside: |
N/A |
Corps of Engineers, Europe District, Contracting Division, CMR 410 BOX 7, APO, AE 09096
Camp Speicher Power Plant and Electrical Distribution DESCRIPTION OF WORK - SPECIFIC The Work described in this section shall include, but not be limited to, the following: Contractor Scope of Work Power Plant: This shall include the procurement, installation, testing, commissioning, and startup of the Power Plant in accordance with the contract documents. The Power Plant shall include a 7-day supply of fuel storage and necessary manifolds and piping    from the tanks to the generators. Fuel storage tank shall be steel construction. Seven-day fuel supply shall be calculated as fuel consumption of all generators running at 70 percent    capacity 24 hours per day for 7 days. The Contractor shall provide concrete pads for fuel tanks, generator, and switchgear. Medium-Voltage Switchgear:    This shall include the installation, testing, commissioning, and energizing of the Main Switchgear and Power Distribution Centers (PDCs), and as specified in the contract documents. Medium-Voltage Distribution:    This shall include the procurement, installation, testing, commissioning, and energizing the high voltage distribution system in accordance with the scope of work.    High voltage cables are both aerial and below grade. This includes all underground cables f rom the Power Plant to the Primary Side of the new Main Switchgear, and from the Secondary Side of the new Main    Switchgear to the pole risers of the Overhead Circuits.    Provide new transformer stations as indicated in the contract drawings.    Provide under ground riser cabling to the new transformer stations.    Secondary cabling from the transformer stations shall be furnished and installed by another contract.      Low Voltage Distribution: This includes the procurement, installation, testing, commissioning and energizing the Low Voltage Distribution System in accordance with the Scope of Work. This includes control voltage for the generator panels, power distribution centers for each generator with control voltage transformers, and secondary voltage for utility lighting, power, and controls in the control building.    Exterior c abling shall be both below grade and above grade. The Contractor shall trench for below grade cables. For above grade cables, the contactor shall install cables in conduits. Grounding System: This shall include the procurement, installation, testing, and commissioning the Grounding (Earthing) System as stated in these documents.    Earth resistance of 25 ohms or less shall be achieved. Pre-Fabricated Control Building:    This shall include the procurement and installation of a pre-fabricated power control building as further described in the specifications.
Ted Kunzog, 011496118162615
Email your questions to Corps of Engineers, Europe District, Contracting Division at Ted.Kunzog@us.army.mil
|
Address: |
Corps of Engineers, Europe District, Contracting Division CMR 410 BOX 7, APO AE |
|
Postal Code: |
09096 |
|
Country: |
DE |